IS HOME
STUDENTS
FACULTY & STAFF
HELP & SERVICES
ACCOUNTS & PASSWORDS
AUDIO & VIDEO SERVICES
ANTI-VIRUS & PHISHING
E-MAIL (EXCHANGE)
HARDWARE & SOFTWARE
HOME COMPUTING
ILE CLASSROOMS
KNOWLEDGEBASE@UMKC
NETWORKING & FILES
ONLINE LEARNING
PHONES
REPORT A PROBLEM
RESIDENCE HALLS
SUMMER CONFERENCES
STUDENT LABS
WEB PAGES
WIRELESS
INSIDE IS
ABOUT US
FORMS
NEWS
OUTAGES
POLICIES & REPORTS
UMKC Information Services
→  Classroom Technology Services Project Insight
Completed Projects
University Center Installation Project

December 2006  - CTS installed High Definition Televisions that provide feeds from satellite communication for signage and MTV.  Throughout the center current information can be viewed from various locations.

Swinney Installation Project

April 2007 - CTS installed High Definition Televisions with wireless transmitters set to various frequencies.  While utilizing the equipment for a workout any FM receiver can be tuned to the televisions frequency to view and listen to the channel on the television.

Meeting Manager Integration

May 2007 - This project started in the latter part of October 2006 and by May 25, 2007 a total of 60 ILE classrooms were incorporated in the ILE monitoring system. This is an on-going project that will keep growing as CTS installs and/or upgrades more classrooms in the future.

HSB ILE Installation Project

June 2007 - CTS installed (5) five full ILE classrooms; 3301, 3428, 4301, 4308, and 5309. Classrooms 3301 and 4301 were expanded to include ITV technology for utilization of Polycom technology. This is a long distance education platform that enables live instructions to multiple locations by (1) one instructor. This project incorporated the installation of (5) partial ILE classrooms. These partial rooms will be evaluated for upgrades to full ILE capability in the future.

Union Station Installation Project

December 2007 - Installation was completed during mid November, 2007, and the final improvements were completed during December 2007.  The project requirements were to provide the capability to combine two conference rooms into one fully functional ILE classroom, or to utilize two separate rooms via one ILE system controller. 

LS Room 2-101 Installation

December 2007 - During Christmas break is the planned time for the installation of room 2-101 to a full ILE classroom.

             Tegrity Pilot

December 2007 - During Christmas break is the planned time for this upgrade.  Completion of this project will provide for a greater number of students Tegrity communication in the classroom.

Medical School ILE Classroom Renovation

Year 2008 - The ILE upgrades for Medical Theater A/B/C is planned for fiscal Year 2008. This renovation will upgrade the ILE system devices which will improve the overall ILE experience for the Student and Instructor, enhance network access and internet capability. 

 


Was this page helpful to you? → or
UMKC Information Services
Left Aligned Site  Center Aligned Site  Standard Font Size  Large Font Size  Normal Page Width  Wider Page Width  Website Preferences Help
Comments? Suggestions?